In this case, the test pressure shall not exceed the maximum allowable test pressure for non-isolated components, such as in-line vessels, pumps, and valves.
对于不能隔离的系统,如:在线容器、泵和阀门等,测试压力不应大于系统组件最高允许测试压力。
Streams are used to isolate work, and UCM projects are used to group the available components together for the isolated work.
流水线是用来分割任务的,U CM项目是为分离的任务将可利用的组件重新聚集在一起。
Overall, however, the concern remains that misbehaving components can use and lock all available threads for a process, even if you have properly configured isolated thread pools.
但是,总的来说,问题依然存在:行为不良的组件能够使用并锁定一个进程的所有可用线程,即使您已经正确配置了隔离的线程池。
应用推荐